Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Ahn, S, Lee, S and Steel, R P (2014) Construction Workers’ Perceptions and Attitudes toward Social Norms as Predictors of Their Absence Behavior. Journal of Construction Engineering and Management, 140(05).

Anh Tuan, B L, Tesfamariam, M G, Chen, Y, Hwang, C, Lin, K and Young, M (2014) Production of Lightweight Aggregate from Sewage Sludge and Reservoir Sediment for High-Flowing Concrete. Journal of Construction Engineering and Management, 140(05).

Anjaneyappa, V, Amarnath, M S and Srinivasamurthy, B R (2014) Compacting Characteristics of Light Compacting Equipment. Journal of Construction Engineering and Management, 140(05).

  • Type: Journal Article
  • Keywords: Equipment and machinery; Soil compaction; Construction equipment; Light compacting equipment; Walk-behind rollers; Plate compactor; Soil compaction; Field density; Construction materials and methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000830
  • Abstract:
    The inadequate of compaction of backfills near abutments, approach areas of culverts, and smaller widened portions of roads result in settlement of layers and premature failure of pavement. Compaction in these constrained areas is difficult because of the difficulty in maneuvering of compacting equipment such as heavy rollers. Various types of light compacting equipment like rammers, vibratory plate compactors, single-drum walk-behind rollers, and double-drum walk-behind rollers are being used for compaction of the materials in constrained areas. Locally available loamy soil was compacted to different layer thicknesses of 50, 100, 150, and 200 mm using selected plate compactors, single-drum walk-behind rollers, and double-drum walk-behind rollers. Field moisture–density relationships for this equipment are established. The studies indicate that the roller optimum moisture content (ROMC) is higher than the optimum moisture content (OMC) of Proctor compaction even after 10 passes for all the light compacting equipment used. The regression equations developed for predicting field density as a function of compacting moisture content in the field, number of passes, and thickness of layer for all the light compacting equipment can be used during construction.

Chen, L and Manley, K (2014) Validation of an Instrument to Measure Governance and Performance on Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 140(05).

Dadi, G B, Goodrum, P M, Taylor, T R B and Carswell, C M (2014) Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. Journal of Construction Engineering and Management, 140(05).

Heravi, G and Jafari, A (2014) Cost of Quality Evaluation in Mass-Housing Projects in Developing Countries. Journal of Construction Engineering and Management, 140(05).

Hu, D and Mohamed, Y (2014) Simulation-Model-Structuring Methodology for Industrial Construction Fabrication Shops. Journal of Construction Engineering and Management, 140(05).

Huang, Y and Pi, C (2014) Real-Option Valuation of Build-Operate-Transfer Infrastructure Projects under Performance Bonding. Journal of Construction Engineering and Management, 140(05).

Kim, J, Greene, M and Kim, S (2014) Cost Comparative Analysis of a New Green Building Code for Residential Project Development. Journal of Construction Engineering and Management, 140(05).

Kim, T W and Fischer, M (2014) Automated Generation of User Activity–Space Pairs in Space-Use Analysis. Journal of Construction Engineering and Management, 140(05).

Li, M, Chen, J, Xu, A, Xia, X and Wang, J (2014) Case Study of Innovative Top-Down Construction Method with Channel-Type Excavation. Journal of Construction Engineering and Management, 140(05).

Rajan, T A, Gopinath, G and Behera, M (2014) PPPs and Project Overruns: Evidence from Road Projects in India. Journal of Construction Engineering and Management, 140(05).

Sousa, V, Almeida, N M, Dias, L A and Branco, F A (2014) Risk-Informed Time-Cost Relationship Models for Sanitation Projects. Journal of Construction Engineering and Management, 140(05).

Wang, Y, Zhu, S and Wong, A S T (2014) Cooling Time Estimation of Newly Placed Hot-Mix Asphalt Pavement in Different Weather Conditions. Journal of Construction Engineering and Management, 140(05).

Xiong, W and Zhang, X (2014) Concession Renegotiation Models for Projects Developed through Public-Private Partnerships. Journal of Construction Engineering and Management, 140(05).

Xu, J and Song, X (2014) Suggestions for Temporary Construction Facilities’ Layout Problems in Large-Scale Construction Projects. Journal of Construction Engineering and Management, 140(05).